County FA sign up Replay to maintain all three of their FDC’s

The Football Development Centre at Flegg High Ormiston Academy in Norfolk, known as the FDC@Flegg, is one of three facilities run by Norfolk County FA.

Elliot Pride, the FDC@Flegg Development Officer oversees the full size 3G pitch at the site, managing everything from accounts, bookings and even getting hands on with the pitch maintenance.

Helping Elliot to keep the surface looking and playing at its best are synthetic specialists Replay Maintenance.

“I’ve been here since we opened the facility 18 months ago and in that time, we’ve made great strides in getting the local community involved with football” explains Elliot. Term-time the pitch is used in school hours by the pupils, then at evenings, weekends and during school holidays Norfolk FA take over offering pay & play, walking football, County 5IVES and a range of pitch hire slots.

“We’re lucky to be supported by a number of local clubs who use the pitch for training and matches. The pitch see’s roughly 25-30 hours of play per week, with that figure increasing year on year.”

A County Partner to Norfolk FA, Replay have been involved with the maintenance of the FDC’s since the original facility opened in Norwich eight years ago. “We were pleased with the work and results achieved with Replay there, when the installer-provided maintenance expired on the Flegg pitch we decided to formulate a contract with them to maintain all three centres.” The service agreement see’s Replay conducting six Revive® visits per year to remove contaminates and de-compact and rotate the infill which is then regraded and dressed back into the surface. This results in enhanced porosity and improved playing characteristics.

“Communication with Replay is great. I have a calendar showing the planned visits for the coming year which gives me plenty of notice to liaise with the school to ensure the pitch is free. On visit days, the operators are normally here by the time I arrive at 8am, getting on with the job and are normally away by midday. Following the visit, we then get a report detailing the work conducted, infill levels etc. We also receive weekly emails to submit our hours of play which then generates an ‘actual hours’ figure, from which we can work out how many hours of in-house maintenance we need to conduct.”

Final word from Elliot, “It’s great to have Replay in conducting a deeper clean every couple of months, topping up the brushing and debris collecting we do ourselves. Although the surface is relatively new, it’s important to consider that they only have a limited lifespan so working hard now to keep the pitch in good condition, should help to keep it safe and playable for years to come.”

Featured News

SISGrass invests in India for next phase of hybrid cricket pitch revolution

Hybrid cricket pitches have been installed at the Himachal...
...Read More

Eight task cassettes for STrac 700 system

The Wiedenmann Maredo STrac 700 system continues to tackle even...
...Read More



Directory

Latest Products

Aspen 4 -

By Aspen


Aspen 4 is alkylate petrol without oil –...

Aspen 2 -

By Aspen


Aspen 2 is alkylate petrol premixed at 50:1 with a...

Arborist 150 -

By GreenMech


The popular Arborist 150 is a simple-to-use and...

VIDEOS

WRT Video Winton FTS -

By Farm Tech Supplies Ltd


Introducing the Foamstream L12 -

By Weeding Technologies


Movember x Turf Tank - 2022 -

By Turf Tank