A fleet of 30 G261 units from Kubota’s G-Series are helping to keep waste and facilities services on track at one of the country’s leading exhibition centres.
The delivery from Hunts Engineering to The NEC Birmingham in March 2025 was well received by Darren Hawkins, Head of Soft Services, and a large team of OCS Group operatives who are now benefitting from Kubota comfort, convenience and reliability across the NEC, Vox Conference Centre and BP Pulse Arena.
OCS Group have been responsible for cleaning, waste, cloakrooms, portering and the wider estates at the NEC Group’s venues since 2012.
Encompassing five venues in total, the need arose to replace the vehicles which are pivotal to the maintenance operation at three of the campus’s busiest sites.

“We narrowed our search down to two brands before speaking to Richard Lucas from Hunts Engineering who brought us a Kubota G261 on demonstration” explains Darren. “We really put the machine through its paces, determined to find the limits of its capability and quite quickly discovered it could deliver everything our previous machines could with the added benefit of fantastic support from Richard and the team.”
With a couple of additional bespoke features – such as the fitting of amber safety beacons - to ensure the G261’s were fully fit for purpose, the first delivery of 20 units was made in March 2025, later joined by an additional 10 in July. “Their main task is to tow 1280 litre bins to various points, collecting litter and other waste during event build ups and breakdowns. As the old saying goes ‘the show must go on’ whether we’ve got machines to collect the litter or not so reliability is critical for us. So far, the Kubota’s haven’t missed a beat.”
The reliability of the fleet of G261’s reaffirms the sentiments of the NEC Estates Team, who have benefitted from the trusty power and performance of a Kubota M5-092 for the last 18 months. “It was the positive feedback from the Estates Department that really spurred me on to look at smaller machines in the Kubota range” Darren adds.
Depending on the event calendar, it’s not unusual for 20 or more of the G261’s to be out working on any given day. “The team have all received training on their operation which has made the transition relatively seamless, and hopefully means we’ll be able to better protect our investment.” Moving forwards, a combination of in-house monitoring and routine maintenance and servicing by Hunts will ensure the venue can continue to depend on the performance of the G261’s for years to come.
Steve Cartmell, NEC Group FM Contract Support Manager added, ““The teams’ choice of working with Hunts to provide Kubota machinery has ensured that the services OCS provide across our site can continue with improved reliability, fuel efficiency and user safety features, making the operation from event to event seamless.”