Ronafix screed goes down swimmingly ready for Glasgow games

Ronafix screed goes down swimmingly ready for Glasgow games
The Tollcross International Swimming Centre in Glasgow has been extensively refurbished in preparation for the Commonwealth Games 2014.

The existing 50 metre pool has ten lanes and a new 50 metre six-lane warm-up and training pool has been added with new fitness suites, an extension of the changing rooms, improvements to the café, further seating and a general refurbishment of the existing facilities.

These improvements will not only provide suitable facilities for the Games but also for future major international swimming competitions as well as providing an excellent permanent recreational and sporting facility for local residents.

The project was funded by Glasgow City Council (£13.15 million) and sportscotland (£650,000), works commenced in May 2011 and the new centre was opened in May 2013.

As part of the redevelopment, the City of Glasgow Department of Architecture specified that the main contractors for the development, Barr Construction, should apply Ronafix Mix A to the stairways at the venue, to provide a hard wearing, dust proof, waterproof surface that could be laid in thin section. The screed was installed by sub contractor Industrial Floor Treatments.

Ronafix Mix A is also available pre-packed as Ronafix Pre-packed Screed 6-50mm.  It has high compressive, tensile and flexural strength and can be trafficked after 24 hours; design compressive strength is 38N/mm² in 24 hours and 70N/mm² after 28 days when cured at 200C.

Ronafix Pre-packed Screed 6-50mm comes from the Ronacrete Ronafix range of specialist quality controlled pre-mixed products. These include pre-packed products for tanking swimming pools and basements, for waterproofing structures, for under floor heating screeds and high-strength, thin and fast drying screeds.

Featured News

Tom Hayes MP to speak at the National Play Conference

Tom Hayes MP, Chair of the All-Party Parliamentary Group (APPG)...
...Read More

Government delivers PE and school sport funding update

The Department for Education has written to schools announcing...
...Read More



Directory

Latest Products

Postsaver Pro-Wrap Rot Protectors -

By Postsaver


Postsaver Pro-Wrap Rot Protectors provide...

KR285E - 5,000 m² Kress EyePilot® 4x4 -

By Kress


Engineered for extremes, EyePilot® 4×4 RTKn...

KR238E - Kress MasterSeries Mega 600 -

By Kress


Designed for continuous overnight operation across...

VIDEOS

The Secret Weapon for Weed & Moss Control - While Being Chemical Free! -

By Westermann UK


How to Clear Moss without Chemicals the Easy Way. -

By Westermann UK


Postsaver - Silver Fern Agri -

By Postsaver