Campaigners claim HS2 green corridor nothing more than greenwash nonsense

HS2 has launched plans for what it calls ‘an unprecedented green corridor’ stretching alongside the route of the project.

The announcement includes the news that seven million trees will be planted along the line of phase 1 from London to Birmingham, and an additional £2m is being made available in the Woodland Fund to support the planting of trees along phase 2a from Birmingham to Crewe.

But the Woodland Trust believes the only thing unprecedented about it is the amount of ancient woodland the railway will destroy.

More than 40 hectares of rare ancient woodland will be destroyed by HS2. Luci Ryan, ecologist at the Woodland Trust said: “This is utter greenwash nonsense from an organisation trying to pretend that HS2 isn’t the most environmentally destructive infrastructure project this country has seen in decades.

“Some 98 beautiful, rare, irreplaceable ancient woods will be destroyed or damaged by this scheme.

“That’s 98 habitats and ecosystems that support a whole host of mammals, birds, invertebrates, fungi and plants.

“And once that ancient woodland is gone, it’s gone forever so while planting new trees is all well and good, it’s no substitute for what will be lost. Their plans - which let’s not forget are a condition of the scheme, not being delivered out of the goodness of their hearts – fall woefully short of replacing what will be lost on something being touted as a green infrastructure project.

“None of this new planting will replace the 30ha of ancient woodland destroyed on phase 1, and the £2m they are making available on phase 2a as part of the Woodland Fund will not replace the 10.2ha of ancient woodland they are destroying there.

“This is like smashing a Ming vase and replacing it with bargain basement crockery.”

Along the Phase One route, which covers 216km from London to the West Midlands, the green corridor will encompass:

  • 7 million new trees and shrubs, including over 40 native species, specific to each location. The new native woodlands will cover over 9 square kilometres of land.
  • Over 33 square kilometres of new and existing wildlife habitat – equating to an area the size of 4,600 football pitches. That’s an increase of around 30% compared to what’s there now.
  • Tailor-made homes for wildlife, ranging from bat houses to 226 new ponds for great crested newts and other amphibians.
  • Earthworks and landscaping which will re-use around 90% of the material excavated during construction.
  • The potential to support community projects and develop amenity spaces such as access routes, public parks, open spaces and nature reserves.

As the corridor is being delivered, HS2 is encouraging local people and organisations to get involved in everything from landscape design to tree planting. This includes supporting local environmental projects through its various community funds.

In a related announcement, the government confirmed a £2 million extension to the HS2 Woodland Fund, so it can cover Phase 2a of the railway, from the West Midlands to Crewe. The fund is designed to help landowners near to the route directly create new native, broadleaf woodlands and restore existing ancient woodland sites. This is in addition to the extensive ‘green corridor’ plans and community funds that are already in place along the wider route.

Mark Thurston, Chief Executive of HS2 Ltd, said: "Alongside improving connectivity, boosting the economy and unlocking new jobs and opportunities, I’m determined to ensure that HS2 also works for the environment and local communities.

"This starts by doing everything we can to reduce our environmental footprint and minimise the expected impact of our construction work. Longer-term, we’ll be leaving behind a network of new wildlife habitats, woodlands, and community spaces, helping to create a lasting legacy along the route.

"We’ve already got to work by supporting a range of community projects and creating a series of new habitats, including planting over 230,000 trees so far. We’ll be calling on local people and organisations to get involved as the ‘green corridor’ starts to take shape."

The government says the appearance of the green corridor will be tailored to the surrounding environment, with native tree species used to ensure that the new woodlands reflect the unique landscape and ecology of the different regions the line passes through.

As the corridor is gradually delivered, HS2 is encouraging local people and organisations to get involved. This includes supporting local environmental projects, through its various funds including the £45m Community & Environment Fund and Business & Local Economy Fund.

Featured News

UK Government urged to fulfil promise to ban sale of peat

The Wildlife Trusts and celebrity supporters are urging the UK...
...Read More

Mark Earles appointed as AEA President

In his address to the association’s annual conference, Mark...
...Read More



Directory

Latest Products

Aspen 4 -

By Aspen


Aspen 4 is alkylate petrol without oil –...

Aspen 2 -

By Aspen


Aspen 2 is alkylate petrol premixed at 50:1 with a...

Arborist 150 -

By GreenMech


The popular Arborist 150 is a simple-to-use and...

VIDEOS

WRT Video Winton FTS -

By Farm Tech Supplies Ltd


Introducing the Foamstream L12 -

By Weeding Technologies


Movember x Turf Tank - 2022 -

By Turf Tank