Gate Way to Manchester (Manchester Oxford Road)

Gate Way to Manchester (Manchester Oxford Road)
The proposals include over 4k of major bus priority lanes and Greater Manchester's first ever"˜Dutch-style' cycle lanes which will see people on two wheels segregated from the traffic. The scheme has been revamped following a major public consultation with nearly 900 residents. Sudstech have already provided approximately 1500m2 of sustainable porous paving in pedestrian areas to aid congestion along the road from the 70'000 plus students that make the area their home every year. 

Due to the heavy amount of foot traffic Manchester city council specified that the material needed to be extremely hard wearing, non-slip and completely SUDS compliment. Due to the versatile nature of the Sudstech product Manchester city council have also specified that the product be used for hundreds of innovative new tree pits included in the scheme.

Featured News

Children’s activity levels rising but inactivity remains too high

The number of children and young people playing sport and taking...
...Read More

The Land Trust publishes 2024-2025 report

In its 2024/2025 Annual Review, the Land Trust reflects on a year...
...Read More



Directory

Latest Products

Trimax Pegasus S5 SR -

By Trimax Mowing Systems


The Pegasus S5 SR builds on the Pegasus’s...

Pegasus S5 -

By Trimax Mowing Systems


Since its introduction in 2001, the Pegasus has...

Trimax Snake S3 -

By Trimax Mowing Systems


The Snake S3 sets the standard for trailed rotary...

VIDEOS

Aeration Jet - Golf -

By Aeration Jet


Aeration Jet - Dumpster -

By Aeration Jet


Aeration Jet - Demo -

By Aeration Jet